Strata scheme CTS 7431

CTS 7431 · Registration date not recorded · Lot count not recorded · Queensland checked 30 June 2026

Public record: 6 tribunal matters. A reasonable pre-screen, but not the full picture, the financials and minutes that decide the purchase are in the report, not the registers. Read it, and obtain a strata records search, before you bid.

The public record is a pre-screen, not the strata report. Read on for the detail, then obtain a strata records search before you bid.

  1. Public record checked

    Litigation, building-work orders, and governance for this scheme, the page you are on.

  2. Read the strata report →

    Paste the section 184 strata search or AGM minutes to see the fund balance and red flags the public registers can't. Obtain a strata records search if you do not have it yet.

  3. Questions to ask

    The specific questions this scheme's record raises, ready for the strata manager or your conveyancer.

  4. Decide

    Take the public record and the report findings to your conveyancer before you bid.

Risk read

What the public record shows for this scheme, read for a buyer. This is not the strata report, and a quiet record is not a guarantee: obtain a strata records search before you bid.

  • 6 litigation matters on record

    Tribunal and court decisions naming this scheme as a party. A litigious building is more likely to be carrying unresolved disputes, defects, or levy fights.

Cost exposure

Moderate exposure

An indicative, itemised estimate of what one lot here could face, built only from this scheme's public-record signals. Indicative ranges, not this building's actual figures, and not financial advice.

Good case $700 per lot
Expected $6,300 per lot
Worst case $24,900 per lot

Special levies are apportioned by unit entitlement. Set this from your contract; 1.0× is an average lot.

Exposure drivers, indicative per-lot ranges
DriverGoodExpectedWorst

Tribunal and legal costs

6 tribunal or court matters on the public record.

Indicative per-lot share of tribunal and legal costs in a strata dispute (NCAT). Scaled for: 6 matters.

$700$6,300$24,900
Total per lot$700$6,300$24,900

Estimate only. Figures are indicative ranges from public remediation programs and reporting, apportioned to one lot; they are not this building's costed works and not financial advice. Obtain the capital works fund balance, any special levy resolved or proposed, and a strata records search before you transact.

Questions to ask before you bid

  • 1

    What is the capital works (sinking) fund balance, its adequacy ratio, and the 10-year plan?

  • 2

    Are any special levies raised, proposed, or scoped-but-not-yet-levied?

  • 3

    Can I see the last two years of AGM minutes, including any motions that were defeated?

Ask about this building

Ask a plain-English question and we'll answer from our record: litigation, building-work orders, water and defect matters, the managing agent, and more.

Save keeps this scheme on your dashboard. Monitoring tracks the matter count from 6 today; we'll flag new matters here as they appear.

Building record

Strata plan CTS 7431 is on the register.

Location not mapped for this scheme yet. Map coverage is New South Wales today. Open the full map.

Litigation

  • Sanchelsea [2024] QBCCMCmr 180

    Other QBCCMCmr 14 May 2024

    COMMITTEE PROCEDURES / REASONABLENESS – where the body corporate committee replaced the standard power outlets in the scheme’s basement carpark with lockable ones – where the applicant has been denied permission to use the locked outlets – where the applicant wants the body corporate to reinstate owners’ access to the outlets – whether the orders sought are warranted in the circumstances. Act, ss 94, 100, 270, 280; Standard Module, ss 52(1), 184, 186

  • Sanchelsea [2023] QBCCMCmr 362

    Other QBCCMCmr 14 September 2023

    APPLICATION FOR INTERIM ORDER – where the body corporate committee has replaced the ordinary power outlets in the scheme’s basesment with lockable ones – where the applicant has been denied permission to use the locked outlets – where the applicant wants the body corporate to reinstate owners’ access to the outlets – whether there are urgent circumstances to warrant granting an interim order in this case Act, ss 94(2), 100, 279(1); Standard Module, ss 52, 184

  • Sanchelsea [2022] QBCCMCmr 236

    Other QBCCMCmr 22 June 2022

    INTERIM ORDER – whether to grant interim order. Act, s 279

  • Sanchelsea [2020] QBCCMCmr 8

    Other QBCCMCmr 7 January 2020

    APPLICATION FOR INTERIM ORDERS – whether the proposed replacement of the scheme roof has been properly authorised by the body corporate; whether the body corporate should be prevented from proceeding with the work pending final orders. Act, s 279(1); Standard Module, ss 151, 152.

  • Sanchelsea [2020] QBCCMCmr 3

    Other QBCCMCmr 3 January 2020

    APPLICATION FOR INTERIM ORDERS – whether the proposed replacement of the scheme roof has been properly authorised by the body corporate; whether the body corporate should be prevented from proceeding with the work pending final orders. Act, s 279(1); Standard Module, ss 151, 152.

  • Sanchelsea [2020] QBCCMCmr 4

    Management and meetings QBCCMCmr 3 January 2020

    APPLICATION FOR INTERIM ORDERS – whether a notice to enter a lot is invalid because the timing of the entry interferes with a peak period for holiday letting, or because the person who is to enter the lot has not been authorised by a resolution of the committee; whether an interim order should be made preventing the body corporate from proceeding before the end of the holiday period. Act, ss 163, 279(1).

Decisions naming this scheme as a party, from QBCCMCmr via AustLII. The line beneath each matter is the decision's own catchwords, quoted; the topic tag is our grouping of those words and reads "Other" when they do not clearly fit, so you can always check it against the source. Every matter links to the full decision. Whether a matter helped or hurt the scheme is not assessed here.

Evidence ledger

Litigation-only record: this scheme is on file because a tribunal matter named its plan number, with no registry address, parcel, or map.

Evidence ledger: what was checked, what it found, how strong the match, and when it was last checked.
CheckedFoundMatchLast checked
Registry and parcelLand registryStub onlyNot harvested here yet
Governance: AGM, managing agent, annual reportingNot yet checkedNot matchedNot harvested here yet
Litigation: NCAT and courts6 mattersDirectNot harvested here yet
Levies and financialsNot yet checkedNot matchedNot in the public record
Defects and building-work ordersOutside current coverageNot matchedNot harvested here yet
Fund balances, current levies, minutes, defects not yet litigatedNot on the public record, and no registry entry for this schemeNot matchedNever in the public record

What was checked, what it found, how strong the match, and when each source last ran. A source that has not run here yet reads as not checked, never as checked and clear. The unknowns the public registers structurally cannot show stay named, so silence above is never read as a clean bill.

Deep report · coming soon

On top of the public record above, the deep report will add the scheme's minutes, financials, capital-works fund, and a defect inspection. We're building it. Leave your email and we'll tell you when it's ready.