Every strata tribunal matter we hold, across the states, filterable like a database. New South Wales matters are read into structured fields, the parties and their roles, who presided, how it ended, and the money in play. Matters in the other states are catalogued from the tribunal register with their citation, scheme, and source, ahead of the same structured read.

Reset

2,399 matters on the public record

Structured strata decisions matching the current filters
DecisionPartiesMemberDisputeOutcomeAmountYear
Waves [2024] QBCCMCmr 269
CTS 31609 catalogued matter
Building defects QBCCMCmr

MAINTENANCE – where the body corporate resolved to paint the entire building with the costs to come from the sinking fund – where the applicant says maintenance of the balconies, patios and exclusive use areas are owners’ responsibilities – whether the painting and remedial works are required to maintain the elements of the building in a structurally sound condition – whether the body corporate can validly incur the cost of the work – whether the sinking fund budget is valid. Act s94(2); Accommodation Module ss 150(3), 170(2), 182(2)&(3), 200

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Villas Mermaid [2024] QBCCMCmr 268
CTS 9057 catalogued matter
Repairs and common property QBCCMCmr

MAINTENANCE; PROPERTY DAMAGE – whether the body corporate is responsible for repairing a leaking shower within a lot, and relevelling a floor forming a boundary of the lot, in a building that has experienced subsidence and building movement. Act, s 281(1)(a); Accommodation Module, ss 170(1)&(2)(b), 201(3); Land Title Act 1994, ss 48C(1), 49C(4).

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Contessa Condominiums [2024] QBCCMCmr 266
CTS 6203 catalogued matter
Building defects QBCCMCmr

ACCESS TO A LOT – whether the body corporate may erect scaffolding on a lot balcony during structural repairs to a slab on a higher level. Act, s 163; Standard Module, s 180(2)(b)(ii)-(iii).

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Contessa Condominiums [2024] QBCCMCmr 267
CTS 6203 catalogued matter
By-laws QBCCMCmr

BY-LAWS – where the respondents have installed hard flooring in their lot – whether the respondents have complied with the hard flooring by-laws. Act, ss 180 to 186

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Starshells [2024] QBCCMCmr 265
CTS 18285 catalogued matter
Repairs and common property QBCCMCmr

BY-LAWS – whether the respondent has contravened the by-laws by running a power cord from his lot to his vehicle parked on common property; by installing a shade sail on common property without body corporate approval; and by installing a fence gate on common property without body corporate approval REASONABLENESS – whether the applicant acted unreasonably by selectively and inconsistently enforcing the by-laws against the respondent and not other owners and occupiers – whether the applicant unreasonably withheld approval for the respondent to install a shade sail on common property – whether the applicant acted unreasonably by requiring the respondent to restore the fence to its original condition but without a gate BIAS – whether the decisions of the committee were impacted by any bias on the part of the chairperson Act, ss 94, 100, 159, 168(2); Standard Module, s 187

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Royal Palm [2024] QBCCMCmr 262
CTS 9098 catalogued matter
By-laws QBCCMCmr

REASONABLENESS – where the body corporate committee has refused to amend the access condition it imposed on the applicant’s pet approval – whether the orders sought by the applicant are warranted in the circumstances. Act, ss 94; 100

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Summer Waters [2024] QBCCMCmr 264
CTS 19297 catalogued matter
Levies and contributions QBCCMCmr

JURISDICTION – where an adjudicator does not have jurisdiction to determine a debt dispute under the Act, whether an application seeking the recovery of a debt is a debt dispute under the Act, and whether a defence raised by the respondents that the debt is not payable can be determined by an adjudicator REASONABLENESS – whether the body corporate acted unreasonably by not providing the respondents with a further opportunity to repair the ruptured pipe themselves; by not notifying the respondents that it would be proceeding with the repair works; and by purportedly failing to communicate effectively with the respondents – whether the repair costs are unreasonable MAINTENANCE – UTILITY INFRASTRUCTURE – whether the respondents can avoid responsibility to maintain a pipe that solely services their lot and is within their lot on the basis that they did not cause damage to the pipe and that they did not originally install the pipe Act, ss 20, 94, 100, 160, 161 and 229A; Standard Module, ss 180, 211 and 212

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Broadbeach Lodge [2024] QBCCMCmr 263
CTS 6196 catalogued matter
Other QBCCMCmr

INTERIM ORDERS – whether interim orders are warranted. Act, s 100(5), s 279; Standard Module, ss 168, 172

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Gemini Towers [2024] QBCCMCmr 260
CTS 14084 catalogued matter
Other QBCCMCmr

IMPROVEMENT TO LOT – where the applicant sought the approval of the body corporate committee to renovate her two adjoining lots, including by making an opening in a load-bearing wall between them; where the committee refused because it believed it could not permit any change to load-bearing walls nor any interference with the support provided by the wall to lots above; whether the committee acted unreasonably and approval should be deemed to have been given. Act, ss 100(5), 165; Standard Module, ss 58(6)(b), 180(2)(b)(iii); Land Title Act 1994, s 115N; Planning Act 2016, ss 44(3), 48(1)-(2); Planning Regulation 2017, s 21(4), schedules 7 & 8; Building Act 1975, ss 6(1)(a)(ii), 20, 21, schedule 2.

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Platinum Business Park [2024] QBCCMCmr 261
CTS 36621 catalogued matter
Repairs and common property QBCCMCmr

BY-LAWS – where lot owner/ occupier has erected a pergola and fence on common property without firstly seeking permission of the body corporate - where body corporate has issued a Notice of Continuing Contravention of a Body Corporate By-law COMMON PROPERTY – where a fence and a pergola/ awning structure have been erected on the common property and no rights of exclusive use have been granted by the body corporate – authorisation required. Act, ss152, 159, 171. Katsikalis v Body Corporate for The Centre [[2009] QCA 77.](/cgi-bin/viewdoc/au/cases/qld/QCA/2009/77.html "View Case")

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Plaza Business Centre [2024] QBCCMCmr 259
CTS 26531 catalogued matter
Management and meetings QBCCMCmr

MEETING NOTICE – whether the body corporate can hold an extraordinary general meeting without 21 days’ notice. Act, s 243A; Commercial Module, s 49

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Pacific Palms Bucasia Holiday Units [2024] QBCCMCmr 256
CTS 17074 catalogued matter
Repairs and common property QBCCMCmr

MAINTENANCE – cracking of floor/ ceiling in building format plan – obligation of body corporate to undertake repairs - whether body corporate is responsible for repair of consequential damage to a lot. APPOINTMENT OF ADMINISTRATOR – Extension of powers. Act ss 152, 227, 228, 276, 281, 301 Standard Module, s 159. Seiwa Pty Ltd v The Owners Strata Plan 35042 [[2006] NSWSC 1157](/cgi-bin/viewdoc/au/cases/nsw/NSWSC/2006/1157.html "View Case") MAGOG Pty Ltd v Body Corporate for the Moroccan [[2010] QDC 70](/cgi-bin/viewdoc/au/cases/qld/QDC/2010/70.html "View Case")

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Pacific Palms Bucasia Holiday Units [2024] QBCCMCmr 258
CTS 17074 catalogued matter
Repairs and common property QBCCMCmr

MAINTENANCE – cracking of floor/ ceiling in building format plan – obligation of body corporate to undertake repairs - whether body corporate is responsible for repair of consequential damage to a lot. APPOINTMENT OF ADMINISTRATOR – Extension of powers. Act ss 152, 227, 228, 276, 281, 301 Standard Module, s 159. Seiwa Pty Ltd v The Owners Strata Plan 35042 [[2006] NSWSC 1157](/cgi-bin/viewdoc/au/cases/nsw/NSWSC/2006/1157.html "View Case") MAGOG Pty Ltd v Body Corporate for the Moroccan [[2010] QDC 70](/cgi-bin/viewdoc/au/cases/qld/QDC/2010/70.html "View Case")

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Sails Resort on Golden Beach [2024] QBCCMCmr 257
CTS 16637 catalogued matter
Management and meetings QBCCMCmr

APPLICATION FOR INTERIM ORDERS – where a motion to be decided at a forthcoming general meeting will propose amending the caretaking service contractor’s engagement and authorisation to remove the requirement that it owns a lot at the scheme; where the applicants object to the body corporate committee’s explanatory note urging a vote in favour of the motion and seek an order that, if passed, the motion is void; whether to prevent the motion from being implemented before the application is decided. Act, ss 94(2), 100(5), 279(1); Accommodation Module, ss 76(1)(b)&(5), 80(7), 125.

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Demal [2024] QBCCMCmr 254
CTS 5704 catalogued matter
By-laws QBCCMCmr

ANIMAL BY-LAW – where the applicant sought approval to bring a dog when holidaying in their lot – where approval was refused - whether the committee acted reasonably – whether approval should be given. Act, ss 94(2), 100(5)

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
The Sands [2024] QBCCMCmr 255
CTS 14967 catalogued matter
Repairs and common property QBCCMCmr

MAINTENANCE; PROPERTY DAMAGE – where the body corporate installed steel beams and posts on the applicant’s balcony to support the overhead balcony slab that had been compromised by concrete cancer; whether the body corporate must reimburse the applicant’s cost of concealing the steel behind painted fibre cement sheets; whether the body corporate must reimburse the applicant’s conciliation and adjudication application fees. Act, ss 94(2), 100(5), 167, 280, 281; Standard Module, ss 180(1) & (2)(b)(ii), 211(3); Land Title Act 1994, ss 48C, 49C(4).

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Casino Towers [2024] QBCCMCmr 253
CTS 34087 catalogued matter
Repairs and common property QBCCMCmr

MAINTENANCE – whether maintenance of a particular window in a body corporate scheme established under a building format plan of subdivision is the responsibility of the body corporate or the applicant lot owner. Act, s 152; Standard Module, ss 180, 211

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Calibre [2024] QBCCMCmr 252
CTS 32615 catalogued matter
Other QBCCMCmr

INTERIM ORDERS – whether interim orders are warranted in the circumstances. Act, ss 100(5), 279

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Florence Court [2024] QBCCMCmr 251
CTS 14927 catalogued matter
Repairs and common property QBCCMCmr

MAINTENANCE; EASEMENT – where the body corporate had a common property water pipe within a lot replaced and the plumber installed the new pipe in a different location; where the body corporate’s expenditure on the work was not properly authorised and the new pipe would obstruct cabinets the applicant hoped to install in his lot; where the applicant claims the committee exceeds its spending limit, fails to keep proper records or provide access to them, and excludes him from correspondence; whether the new water pipe must be returned to the location of the old pipe and the body corporate must audit its statement of accounts. Act, ss 20, 62, 68(1), 70(1)(b) & (2)(b), 94(2), 100(5), 101B(3), 108, 186; Standard Module, ss 45, 172, 176(1), 180(1), 187; Land Title Act 1994, s 115O.

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Lakeview Manor [2024] QBCCMCmr 250
CTS 10368 catalogued matter
Repairs and common property QBCCMCmr

PROPERTY DAMAGE – whether the body corporate has an obligation to make good termite damage in the lot. MAINTENANCE – whether the body corporate has an obligation to replace a missing lock on a garage door. IMPROVEMENTS – where a fence has been installed on common property by a lot owner – whether the installation of the fence amounts to a disposition of common property. Act, ss 170, 281; Standard Module, ss 180, 187.

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Broadbeach Lodge [2024] QBCCMCmr 249
CTS 6196 catalogued matter
Levies and contributions QBCCMCmr

REASONABLENESS – where a developer had conditional contracts to purchase 9 of the 12 lots in the scheme and was investigating scheme termination, whether the body corporate was acting reasonably when it decided at a general meeting to pass motions and engage consultants to prepare certain reports and raise levies to fund the reports – whether body corporate was acting reasonably when it decided not to pass certain motions to approve maintenance works to the roof of the building at the scheme. Act, s 94(2)

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
11 Project Avenue [2024] QBCCMCmr 248
CTS 25882 catalogued matter
Management and meetings QBCCMCmr

GENERAL MEETING MOTION – whether a resolution to authorise a body corporate manager to act for the body corporate was valid Act, s 97

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Odyssey Villas [2024] QBCCMCmr 247
CTS 45835 catalogued matter
Repairs and common property QBCCMCmr

BODY CORPORATE RECORDS – whether lot owner made a valid request for records – whether there is any basis for the body corporate not to provide a copy of the requested records; REQUESTED EXTRAORDINARY GENERAL MEETING – whether lot owner made a valid request to call an EGM; whether there is any basis for the committee not to call and hold the EGM; MAINTENANCE – whether sewer pipes are in need of maintenance – whether there is a dispute about works to be done; where body corporate carried out pest control to common property, exclusive use areas and internal units – whether lot owners are responsible for costs to internal and exclusive use areas - whether the motion authorising the works and payment should be invalidated. Act, ss 205, 270(3); Standard Module, ss 84-86, 180,192, 228, 231

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Renovare Arboreti [2024] QBCCMCmr 246
CTS 53012 catalogued matter
Other QBCCMCmr

FINANCIAL YEAR– whether the financial year end date for the body corporate should be changed by an adjudicator Act, ss 283 and 321A

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
C Breeze [2024] QBCCMCmr 243
CTS 53007 catalogued matter
Repairs and common property QBCCMCmr

GENERAL MEETING MOTION regarding IMPROVEMENT TO COMMON PROPERTY – whether valid. Act, s 152; Standard Module, ss 180(2)(a)(ii), 186, 187

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Isobel Terrace [2024] QBCCMCmr 242
CTS 29646 catalogued matter
By-laws QBCCMCmr

BY-LAWS – where lot owner has placed a plastic lattice plant trainer on her balcony without firstly seeking permission of the body corporate & body corporate issued a Notice of Continuing Contravention of a Body Corporate By-law REASONABLENESS - Section 94(2) Act - requirement of body corporate to act reasonably-– impact on external appearance - whether the body corporate has acted reasonably. Act, ss 59, 94, 182.

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Jefferson Villas [2024] QBCCMCmr 237
CTS 17940 catalogued matter
Repairs and common property QBCCMCmr

INTERIM ORDER – Application for interim order– whether warranted in circumstances\_.\_ SDW2 Pty Ltd v JLF Corporation Pty Ltd [[2017] QSC 001](/cgi-bin/LawCite?cit=%5b2017%5d%20QSC%20001 "View LawCiteRecord") Australian Broadcasting Corporation v O'Neill [[2006] HCA 46](/cgi-bin/viewdoc/au/cases/cth/HCA/2006/46.html "View Case") Act ss 238, 247, 276, 279 MAINTENANCE – where roofing membrane is on common property allocated under an exclusive use by-law – extent of body corporate’s responsible for maintenance where an improvement is made to common property for a lot owner. Act, s281; Standard Module, ss 180, 192(2) & 192(3)

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
McWhirters Apartments [2024] QBCCMCmr 239
CTS 30246 catalogued matter
Other QBCCMCmr

INTERIM ORDER – whether interim orders are warranted. Act, s 279

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Nine Miles [2024] QBCCMCmr 240
CTS 27050 catalogued matter
Management and meetings QBCCMCmr

GENERAL MEETING MOTION – where a motion proposed cleaning and repointing the roof at a cost exceeding the relevant limit for major spending; where the motion was accompanied by only one quotation for that work, and other quotations for variations on the work; whether the motion was void for failure to provide two quotations for the specific work proposed in the motion. Standard Module, s 173(1)-(2).

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Vision-Golden Beach [2024] QBCCMCmr 238
CTS 44456 catalogued matter
Repairs and common property QBCCMCmr

GENERAL MEETING MOTION – whether the body corporate should have provided a second quote for works over the major spending limit. MAINTENANCE – whether the body corporate can recover maintenance costs from a lot owner. Act, s 229A; Accommodation Module, ss 201, 202.

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Indooroopilly Gardens [2024] QBCCMCmr 236
CTS 15738 catalogued matter
Repairs and common property QBCCMCmr

IMPROVEMENT TO COMMON PROPERTY – where the committee engaged a contractor to replace locks with a new registered locking system – whether the committee had the authority to make that decision – whether the previous unregistered locking system should be reinstated. Act, ss 94, 100; Standard Module, ss 52, 172, 173, 186

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Bingara [2024] QBCCMCmr 231
CTS 13779 catalogued matter
Repairs and common property QBCCMCmr

PROPERTY DAMAGE – where the common property roof leaked and damaged the applicant’s ceiling; whether the body corporate must reimburse the applicant’s expenditure on repairs to the ceiling and replace the ceiling. Act, s 281; Standard Module, s 180(1).

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Renovare Venusto [2024] QBCCMCmr 230
CTS 54811 catalogued matter
Other QBCCMCmr

CHANGE OF FINANCIAL YEAR – whether an order should be made to change the body corporate’s financial year end date. Act, s 283

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Renovare Viridi [2024] QBCCMCmr 233
CTS 54872 catalogued matter
Other QBCCMCmr

FINANCIAL YEAR – whether the financial year end date for the body corporate should be changed. Act, s 283.

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Renovare Yeronga [2024] QBCCMCmr 232
CTS 52114 catalogued matter
Other QBCCMCmr

FINANCIAL YEAR – whether the financial year end date for the body corporate should be changed. Act, s 283.

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Azzura Greens [2024] QBCCMCmr 228
CTS 19482 catalogued matter
Management and meetings QBCCMCmr

GENERAL MEETINGS – validity Act, s94C, Schedule 2, Part 2, s 4(a), Schedule 4, s 7

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Contessa Condominiums [2024] QBCCMCmr 226
CTS 6203 catalogued matter
Levies and contributions QBCCMCmr

GENERAL MEETING MOTIONS – where the body corporate approved works and a special levy to fund those works – where the body corporate deferred the works to review the scope of works – where the body corporate raised the special levy – whether the motions were valid – whether the levies should be refunded. Act, s 242; Standard Module, s 116

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Dwell [2024] QBCCMCmr 225
CTS 53437 catalogued matter
Management and meetings QBCCMCmr

ANNUAL GENERAL MEETING – where the annual general meeting is to be held more than three months after end of financial year – whether to grant permission for the annual general meeting to be held late – whether to declare the annual general meeting will be not be invalid for being held late Accommodation Module s 73

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
McWhirters Apartments [2024] QBCCMCmr 227
CTS 30246 catalogued matter
Other QBCCMCmr

INTERIM ORDER – whether interim orders are warranted. Act, s 279

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Tranquility Garden City Residences [2024] QBCCMCmr 224
CTS 48336 catalogued matter
Other QBCCMCmr

COMMITTEE DECISION – REASONABLNESS – where the committee approved the applicant’s proposal to install a cat net on her lot’s balcony but subject to the condition that it be similar to a balcony screen installed on another lot which was not designed for animal containment – whether the committee acted unreasonably by imposing that condition – whether the applicant ought to have deemed approval to install a cat net on her balcony without that condition EXTERNAL APPEARANCE OF LOT – whether there was an unacceptably substantial change to the appearance of a lot which warranted the body corporate refusing permission for an installation Act, ss 94(2) and 100(5)

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Kuranda Resort Principal [2024] QBCCMCmr 222
CTS 30781 catalogued matter
Other QBCCMCmr

EMERGENCY ORDER\_-\_ APPOINTMENT OF ADMINISTRATOR whether an administrator should be appointed – who should be appointed, with what powers, and for how long. Act ss 227, 229(3), 243A, 301.

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
President [2024] QBCCMCmr 221
CTS 14209 catalogued matter
Repairs and common property QBCCMCmr

MAINTENANCE – where the scheme’s building requires significant remedial works but owners have voted down motions to address the maintenance issues – whether it is unreasonable for the body corporate to decide not to carry out necessary repairs. Act, ss 94, 100, 152, 160, 287, 288; Accommodation Module, ss 170, 201

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
The Headlands Caloundra [2024] QBCCMCmr 223
CTS 9157 catalogued matter
Repairs and common property QBCCMCmr

GENERAL MEETING MOTIONS – MAINTENANCE – where a motion to replace windows in a lot was passed and then rescinded – whether the original motion was valid – whether the rescission motion was valid – whether the body corporate must replace a window in a lot. Act, ss 94(2), 100(5), 163, 242; Standard Module, ss 116, 172, 180

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Portafino [2024] QBCCMCmr 219
CTS 5556 catalogued matter
Repairs and common property QBCCMCmr

ADMINISTRATOR – whether an administrator should be appointed to resolve a conflict about the use of the common property and alterations to the lots. Act, ss 21, 62(2)-(3), 95(1)(a), 195, 196, 339(5)(a); Standard Module, ss 3, 13(5), 82(1), 135, 180(1), 187(4)(b).

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Portafino [2024] QBCCMCmr 220
CTS 5556 catalogued matter
Repairs and common property QBCCMCmr

IMPROVEMENTS TO COMMON PRPOPERTY; DISPOSITION OF COMMON PROPERTY – whether the respondents must remove a deck that was constructed without body corporate approval on unallocated common property; whether the respondents must reverse landscaping changes they made to the common property without body corporate authorisation; whether a fence must be removed to allow lot 1 unfettered access to common property beyond it. Act, ss 10(2)(b), 35(1), 62(2), 94(1)(a); Standard Module, ss 184(2)(a), 187; Land Title Act 1994, s 48C.

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Capricorn Gardens [2024] QBCCMCmr 217
CTS 7544 catalogued matter
Other QBCCMCmr

INTERIM ORDER – whether interim orders are warranted. Act, s 279

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Petrie Point Apartments [2024] QBCCMCmr 215
CTS 28735 catalogued matter
Other QBCCMCmr

INTERIM ORDER – whether interim orders are warranted in the circumstances. Act, ss 96, 279; Accommodation Module, s 200.

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Summerwind Coolum [2024] QBCCMCmr 216
CTS 2515 catalogued matter
Repairs and common property QBCCMCmr

BY-LAWS – where occupier is parking vehicle on common property – whether the vehicle causes an obstruction in contravention of the by-laws – whether body corporate approval was given – whether orders can be made against the respondent owner. Act, ss 94, 185

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Hillhaven [2024] QBCCMCmr 214
CTS 14975 catalogued matter
Other QBCCMCmr

BODY CORPORATE RECORDS – whether access wrongfully denied; REASONABLENESS – of body corporate installing gutters on lot 15 deck. Act, ss 20, 94, 100(5), 205; Standard Module, ss 180, 231

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024
Kuranda Resort Accommodation [2024] QBCCMCmr 213
CTS 30745 catalogued matter
Other QBCCMCmr

EMERGENCY ORDER\_-\_ APPOINTMENT OF ADMINISTRATOR Act s\_s\_ 227, 229(3), 243A, 301.

On the tribunal register; not yet read into parties, outcome, and amount. Read the source decision.

2024